PAT Testing Method
Statement
(Based on an Office Environment)
|
The first job
is to establish whether or not the equipment that is due to be tested is
switched off. In order to do this the engineer will move the mouse and check
the VDU for change. He will also listen to the hard drive for any signs of
activation. The power light is also checked.
If the
computer has been left on then, depending on the instructions of the
customer, the computer is either powered down by the engineer or not tested.
The
preparation for testing begins once the computer is off. Any items that are
obstructing access to the cables are moved. The engineer will aim to move any
items as little as possible but it should be noted that sometimes this is not
possible, as adequate access is necessary to complete the tests. Our aim is
for the customer to be unaware that a test has occurred with the exception of
newly applied labels to the equipment.